Job well done for narrow bridge installation

APC acknowledged for their hard work during a barrier installation on a narrow bridge in East Yorkshire

 

East Yorkshire Council have forwarded their thanks and acknowledgement of a job well done for their work with One Way Traffic Management on a recent barrier installation at Hagg Lane Bridge, East Yorkshire.

The installation was a tricky one due to the width of the bridge which needed temporary barriers installing whilst bridge repair works are being carried out.  APC’s barriers were also ideal as they are freestanding and do not require anchoring so do not risk any damage to the bridge deck.

The video below shows how APC’s installation method using the rubber duck made light work of installing the barriers in tight spaces where other equipment would have failed.

 

For more information on the East Yorkshire bridge works or suitability for concrete barriers on bridge works, pinch point schemes or roundabout improvement works, please give us a call.

Comments are closed.